Engineering for factories and the lines inside them

Steyer Engineering supports factories and equipment builders from mechanical design through simulation, installation, and commissioning. The company is certified to ISO 9001:2015. Headquarters are in Taraz, administration is in Almaty. Work is on site and by remote connection.

The jobs on the floor

A new line, a retrofit, and keeping a running line available are different jobs. Launch dates get short. Older machines often have no drawing that matches what is standing there. Few people move easily between mechanical design, controls, and the physical commissioning of a cell. Changeover stops and worn tooling show up as lost output. The engineers on these jobs have worked on automotive and other manufacturing lines in Europe and Central Asia, including lines commissioned for OEMs and tier-1 suppliers.

Design before the steel

Fixing a cell on paper costs less than fixing it on the floor. We draw layouts, fixtures, tooling, and equipment models, then check them with simulation, virtual commissioning, and a digital twin before the hardware arrives. Cycle time, reach, clearances, and PLC logic are run in the model. The site ramp then checks what the model already showed.

On site, and the systems around the line

For installation and for a fault that needs someone there, engineers come to the plant. Between visits, remote work covers design reviews, troubleshooting, and the documents. Project management keeps scope, dates, and the interfaces across mechanical, controls, and integration. Where the job needs it, we add building automation (BMS, HVAC, energy) and software (portals, ERP, QMS, and the links between them).

Frequently asked questions

Do you handle new lines as well as retrofits?

Yes. A new line, a retrofit, and keeping a running line available are all part of the work, from mechanical design through simulation, installation, and commissioning.

What if our older machines have no current drawings?

That is common. We draw layouts, fixtures, tooling, and equipment models, on site where the equipment has to be checked, so the documents match what stands on the floor.

Why check a cell in simulation first?

Fixing a cell on paper costs less than fixing it on the floor. Cycle time, reach, clearances, and PLC logic are run in the model, so the site ramp only confirms what the model already showed.

Can you also cover controls, software, and the building?

Yes. Where the job needs it, we add PLC and controls, building automation (BMS, HVAC, energy), and software such as portals, ERP, QMS, and the links between them.

What you get

  • ISO 9001:2015
  • Installation and commissioning, on site or remote
  • CAD, simulation, and virtual commissioning on the same job
  • A digital twin before the hardware arrives
  • Engineers who have commissioned OEM and tier-1 lines
  • Software, ERP, QMS, and building automation when the job needs them

Describe the line. We will answer with the engineering steps.